Number
|
Issued by
|
Issue date
|
Subject
|
Approval Holder / Type Designation
|
Effective date
|
Attachment |
2011-0044-E
|
|
2011-03-14
|
SUPERSEDED BY EASA AD 2012-0111
|
|
2011-03-15
|
|
US-2011-05-07
|
|
2011-03-14
|
Stabilizers - Rudder Main Tabular Spar - Inspection / Rapair
|
-
ALLIED AG CAT PRODUCTIONS, INC.
|
2011-03-17
|
|
2011-0016
|
|
2011-03-14
|
[Correction] Landing Gear - Main Landing Gear to Wing Fitting - Inspection / Repair / Replacement
|
-
BAE SYSTEMS (OPERATIONS) LTD
-
Jetstream 3100
-
Jetstream 3200
|
2011-02-15
|
|
US-2011-04-09
|
|
2011-03-11
|
NOT ADOPTED - EASA INFORMATION ATTACHED - SUPERSEDED BY FAA AD 2012-11-09
|
-
BOEING
-
707
-
717
-
720
-
727
-
737
-
747
-
757
-
767
-
777
-
787
-
DC-10
-
DC-8
-
DC-9
-
MD-10
-
MD-11
-
MD-88
-
MD-90
-
GULFSTREAM AEROSPACE CORPORATION
-
LEARJET, INC.
-
24
-
25
-
28
-
29
-
31/35/36
-
45
-
55
-
60
-
LOCKHEED MARTIN CORPORATION
-
1329 (Jetstar)
-
188 (Electra II)
-
382 (Hercules)
-
L-1011 (Tristar)
-
MARYLAND AIR INDUSTRIES, INC.
-
FAIRCHILD F-27
-
FAIRCHILD FH-227
-
SABRELINER CORPORATION
-
TEXTRON AVIATION INC.
-
400 (Beechjet)
-
4000 (Horizon)
-
500/550 (Citation)
-
560/560XL
-
650
-
680
-
750 (Citation X)
-
BAe/BH/DH/HS.125
-
Hawker
-
MU-300 (Diamond)
|
2011-03-14
|
|
2011-0036
|
|
2011-03-11
|
[Correction] Fire Protection, Nacelles / Pylons – Wing Pylon Interface /
Double-Wall Fuel Pipe Assembly – Inspection / Modification
|
|
2011-03-16
|
|
2011-0042
|
|
2011-03-11
|
Landing Gear– Landing Gear Hydraulic Actuators–
Modification
|
-
TECNAM, Costruzioni Aeronautiche
|
2011-03-25
|
|
US-2011-03-01
|
|
2011-03-09
|
Engines - Turbofan Engines - Time Limits Section (TLS) Manual and Continuous Airworthiness Maintenance Program - Revision
|
|
2011-03-04
|
|
US-2011-02-06
|
|
2011-03-09
|
Fuselage - Fuselage Skin - Internal Backup Structure - Inspections / Repair
|
|
2011-03-01
|
|
US-2011-02-05
|
|
2011-03-09
|
Fuselage - Fuselage Skin - Inspection / Repair / Report
|
|
2011-03-01
|
|
US-2011-02-03
|
|
2011-03-09
|
Landing Gear - Nose Wheel Well Spin Brake Assemblies - Springs - Inspection / Replacement / Installation
|
|
2011-02-16
|
|
US-2011-01-15
|
|
2011-03-09
|
SUPERSEDED BY FAA AD 2017-20-05
|
|
2011-01-25
|
|
US-2011-01-05
|
|
2011-03-09
|
Fuselage - Aft Pressure Bulkhead Web - Inspections / Modification / Repair
|
|
2011-02-14
|
|
2011-0039
|
|
2011-03-08
|
Engine Fuel & Control – High Pressure Fuel Pump – Inspection /
Replacement
|
|
2011-03-22
|
|
2011-0037-E
|
|
2011-03-08
|
[Correction] Flight Controls – Parachute Opening System Pulleys – Inspection / Replacement
|
-
BALLONS CHAIZE
-
CS SERIES HOT AIR BALLOONS
-
JZ SERIES HOT AIR BALLOONS
-
JZX SERIES HOT AIR BALLOONS
|
2011-03-08
|
|
2011-0040
|
|
2011-03-08
|
SUPERSEDED BY EASA AD 2012-0053
|
|
2011-03-22
|
|
2011-0038-E
|
|
2011-03-04
|
[Correction] Tail Rotor Drive – Tail Gearbox (TGB) Control Lever – Inspection / Rework / Replacement
|
|
2011-03-08
|
|
US-2011-05-04
|
|
2011-03-03
|
Wings - Fuel Tanks Fastener Sealing - Wire Bundles - Inspections / Repair
|
|
2011-03-31
|
|
2011-0035
|
|
2011-03-02
|
Wings – Centre Wing Box Lower Panel – Inspection
|
|
2011-03-16
|
|
2011-0034
|
|
2011-03-02
|
SUPERSEDED BY EASA AD 2013-0277
|
|
2011-03-16
|
|
2010-0242-CN
|
|
2011-03-02
|
CANCELLED: Engine – High Pressure / Intermediate Pressure (HP/IP) Structure – Inspections
|
-
ROLLS-ROYCE DEUTSCHLAND Ltd & Co KG
|
2011-03-02
|
|