| Number |
2016-0078 |
| Issued by |
Europe |
| Issue date |
2016-04-27 |
| Effective date |
2016-05-04 |
| EASA approval number |
|
| ATA Chapter |
72 |
Approval Holder / Type Designation |
-
ROLLS-ROYCE DEUTSCHLAND Ltd & Co KG
-
RB211 TRENT 800
-
875-17
-
877-17
-
884-17
-
884B-17
-
892-17
-
892B-17
-
895-17
|
| Revision |
Not applicable
|
| Correction |
This AD is republished to correct paragraph (1), where time since new (first installation of an affected HPC stage 1-4 drum on an engine) was inadvertently not included in the inspection threshold.
|
| Supersedure |
None
|
| Publication(s) and related information |
RR SB RB.211-72-J195 original issue dated 26 February 2016.
The use of later approved revisions of this document is acceptable for compliance with the requirements of this AD. |
| PAD number |
16-031 |
| Remarks |
1. If requested and appropriately substantiated, EASA can approve Alternative Methods of Compliance for this AD.
2. This AD was posted on 29 February 2016 as PAD 16-031 for consultation until 28 March 2016. The Comment Response Document can be found at https://ad.easa.europa.eu.
3. Enquiries regarding this AD should be referred to the EASA Safety Information Section, Certification Directorate. E-mail: ADs[at]easa.europa.eu.
|