Publ. number |
Issue date |
TC Holder |
Type |
Subject |
2009-0054 |
2009-03-06 |
SCHEMPP HIRTH |
JANUSC, JANUSCT |
Horizontal and Vertical Stabilizers - Balance weights and Hinge Moments of the Elevator and Rudder - Inspection / Check |
2009-0053 |
2009-03-05 |
BAE SYSTEMS (OPERATIONS) LTD |
ATP |
Time Limits / Maintenance Checks - Airworthiness Limitations - Implementation |
2009-0050 |
2009-03-05 |
DASSAULT |
FALCON2000, FALCON2000EX |
Main Landing Gear - Shock Absorber Restrictor - Inspection / Repair / Modification |
2009-0052 |
2009-03-05 |
BAE SYSTEMS (OPERATIONS) LTD |
JETSTREAM4100 |
Time Limits / Maintenance Checks - Airworthiness Limitations - Implementation |
CF-2009-04 |
2009-03-05 |
BELL |
427 |
Hydraulic Pump - Driveshaft Assembly |
2009-0051 |
2009-03-05 |
ROLLS-ROYCE PLC |
RB211 TRENT 900 |
Engine - HP Turbine Nozzle Guide Vane (NGV) Convex Surface -Inspection |
CF-2009-03 |
2009-03-05 |
BELL |
407 |
Hydraulic Pump - Driveshaft Assembly |
2009-04-15 |
2009-03-03 |
BOEING |
737 |
Stringer tie clips - repetitive internal eddy current and detailed inspections/ repetitive external eddy current sliding probe inspections. |
2009-02-05 |
2009-03-03 |
BOEING |
777 |
Airplane information management system (AIMS) |
2009-04-06 |
2009-03-03 |
BOEING |
747 |
Aft pressure bulkhead. Initial detailed inspection/ Revision . |
2009-04-16 |
2009-03-03 |
BOEING |
747 |
External skin doublers - Inspection / Optional Terminating Modification. |
2009-03-02 |
2009-03-03 |
MCDONNELL DOUGLAS |
DC10, MD10, MD11 |
Auxiliary hydraulic pumps - Modification/Prior or Concurrent Actions - Modification and Rerouting. |
2009-05-05 |
2009-03-02 |
AVIDYNE CORP. |
|
Primary Flight Displays - Check / Modification |
2009-04-04 |
2009-03-02 |
CESSNA |
401, 402 |
Auxiliary wing spar - Inspection / Rework |
2009-04-17 |
2009-03-02 |
GENERAL ELECTRIC |
CF6 |
Long fixed core exhaust nozzle (LFCEN) assembly - Replacement |
2009-0046 |
2009-03-02 |
BAE SYSTEMS (OPERATIONS) LTD |
AVRO146RJ, BAE146 |
Fuselage - Frame 29 Wing-to-Fuselage Lug Plate Attachment Joint - Inspection / Repair |
2009-0048 |
2009-03-02 |
EUROCOPTER DEUTSCHLAND |
BK 117 |
Time Limits / Maintenance Checks - Airworthiness Limitations - Amendment |
2009-0047 |
2009-03-02 |
FOKKER SERVICES |
F27 |
Flight Controls - Flap Mechanical Drive - Inspection |
2009-0049 |
2009-03-02 |
FOKKER SERVICES |
F27 |
Engine Controls - Automatic Flight-Idle Stop Control Unit - Installation |
2009-0045 |
2009-02-27 |
AIRBUS |
A300-600, A310 |
Equipment / Furnishings - IPECO Pilot and Co-pilot Seats - Inspection / Modification / Replacement |
2009-0044 |
2009-02-27 |
328 Support Services GmbH |
328-100, 328-300 |
Flight Controls - Elevator-, Rudder- and Aileron Trim Tab Assemblies - Inspection / Replacement |
2009-0043-E |
2009-02-27 |
BAE SYSTEMS (OPERATIONS) LTD |
AVRO146RJ, BAE146 |
Landing Gear - Nose Landing Gear - Inspection / Replacement |
2009-04-10 |
2009-02-27 |
GENERAL ELECTRIC |
CF6 |
Critical life-limited parts - Revision of the Airworthiness Limitations Section. |
2009-05-02 |
2009-02-27 |
GENERAL ELECTRIC |
CF6 |
Drainless fuel manifold assemblies - inspection and loop clamp replacement. |
2008-24-51 |
2009-02-26 |
BOEING |
737 |
Fuel Pump |
2009-0042 |
2009-02-25 |
AGUSTA |
AB 139, AW 139 |
Electrical Power - Generator Control Unit (GCU) - Replacement |
CF-2007-20R2 |
2009-02-25 |
BOMBARDIER |
DHC-8 |
Main Landing Gear Retract Actuator |
2009-0041 |
2009-02-25 |
AIRBUS |
SN 601 |
Landing gear - Main Landing Gear Shock Absorber - Inspection / Restoration |
2009-03-01 |
2009-02-24 |
LEARJET |
55 |
Lavatory light assembly - Inspection / Modification |
2009-04-03 |
2009-02-24 |
ROLLS-ROYCE USA |
AE 1107C, AE 3007A1E |
2nd,3rd and 4th stage compressor wheels, compressor cone shaft assemblies, and 1st to 2nd-stage turbine spacers - New reduced life limits - |
2009-04-02 |
2009-02-24 |
PRATT & WHITNEY |
PW4090, PW4090-3 |
Front turbine hub P/N 53L601 - Reduced Life Limits |
2009-02-03 |
2009-02-23 |
EMBRAER |
ERJ190 |
[Corrected] Outboard Slat Skew Sensor - Operational Check / Replacement |