Publ. number |
Issue date |
TC Holder |
Type |
Subject |
2013-0212 |
2013-09-13 |
DG-FLUGZEUGBAU |
DG-500, DG-800 |
Starting - Starter Motor Control Unit - Replacement |
2012-0240-CN |
2013-09-13 |
FOKKER SERVICES |
F28 |
CANCELLED: Fuel - Centre Wing Tank Maximum Level Sensor Wiring - Modification [Fuel Tank Safety] |
2013-0213 |
2013-09-13 |
AUSTRO ENGINE GMBH |
E4 |
Engine - Waste Gate Controller - Replacement |
2013-0108R1 |
2013-09-13 |
AIRBUS |
A380 |
Wings - Wing Rib Feet - Modification |
2013-0211-E |
2013-09-12 |
EUROCOPTER |
AS 332, EC225 |
Equipment and Furnishing - Life Raft / Sponson Ejectable Cowling - Inspection |
2013-0210 |
2013-09-11 |
AIRBUS |
A300 |
Landing Gear / Pneumatic - Life Limits - Implementation |
2013-0209 |
2013-09-10 |
RUAG Aerospace Services, GmbH |
228 |
Landing Gear - Main Landing Gear Axle - Inspection |
2013-0208 |
2013-09-10 |
BAE SYSTEMS (OPERATIONS) LTD |
HP 137 JETSTREAM MK 1, JETSTREAM200, JETSTREAM3100 |
Landing Gear - Main Landing Gear - Inspection / Replacement |
2013-0207 |
2013-09-09 |
BAE SYSTEMS (OPERATIONS) LTD |
AVRO146RJ, BAE146 |
Fuselage - Rear Fuselage Skin and Frames - Inspection / Repair |
2013-0205 |
2013-09-09 |
EUROCOPTER |
AS 355 |
Fuel - FUELTRON Flowmeter Installation - Removal |
US-2013-10-04 |
2013-09-09 |
PIPER AIRCRAFT INC. |
PA-31 (Navajo) |
[Correction] Engine Exhaust - Exhaust System Downstream - Inspection |
2013-0206 |
2013-09-09 |
BAE SYSTEMS (OPERATIONS) LTD |
JETSTREAM3100, JETSTREAM3200 |
Landing Gear - Main Landing Gear - Modification |
2013-0172R1 |
2013-09-06 |
SAAB AB, AERONAUTICS |
2000 |
Water / Waste - Potable Water System - Deactivation |
US-2013-15-14 |
2013-09-06 |
BOEING |
737 |
Wings - Downstop Assemblies - Inspection / Modification |
2013-0204 |
2013-09-06 |
AIRBUS |
A300, A300-600, A300-600ST BELUGA |
Hydraulic Power - Fire Shut-Off Valve Bonding Lead and Wiring - Inspection / Repair |
US-2013-13-12 |
2013-09-06 |
BOEING |
737 |
Doors - Corners and Cross Beams of Aft Cargo Door - Inspection / Modification |
2013-0203 |
2013-09-06 |
AIRBUS |
A320 |
Fuselage - Frame 47 Splice Plate Butt Joint Crossing Area - Inspection / Repair |
US-2013-15-16 |
2013-09-06 |
BOEING |
737 |
Doors - Inboard Main Landing Gear (MLG) Door - Inspection |
2013-0202 |
2013-09-05 |
AIRBUS |
A318, A319, A320, A321 |
Landing Gear - Landing Gear Control and Interface Unit Wiring - Modification |
US-2013-15-11 |
2013-09-04 |
BOEING |
727 |
Stabilizers - Vertical Stabilizer - Left and Right Side Chords of The Fin Closure Rib and High Frequency Eddy Currrent Inspections /Repair/Replacement. |
2013-0201 |
2013-09-04 |
AIRBUS |
A330, A340 |
Air Conditioning - Cabin Pressure Control System Safety Valve - Replacement |
US-2013-15-15 |
2013-09-04 |
BOEING |
727 |
Fuselage - Frames - Inspection |
GA8-7 |
2013-09-02 |
GIPPSLAND |
GA8 |
Fuel System Ventilation and Drainage Modification |
2013-0151R2 |
2013-09-02 |
ROLLS-ROYCE DEUTSCHLAND |
Tay |
Engine - Low Pressure Compressor / Fan Blade - Inspection / Replacement |