|
G-001-09-95 : Hydraulics - Introduction of revised piping to the auxiliary reservoir supply and brake pressure bleed system. Removal of the landing gear bypass pipeline and fitting of additional non return valve in the main pressure system. With revised flight manual procedures.
|