|
Number
|
Issued by
|
Issue date
|
Subject
|
Approval Holder / Type Designation
|
Effective date
|
Attachment |
|
G-010-03-85
|
|
1985-03-01
|
DOWTY ROTOL - Landing Gear – Nose undercarriage – Inspection of main fitting.
|
-
APPLIANCES
-
VIKING AIR LTD
|
1985-03-01
|
|
|
G-013-03-85
|
|
1985-03-01
|
Engine - Fuel Control - FFG - Blanking of the P1 vent orifice in the altitude bias sensor.
|
-
ROLLS-ROYCE DEUTSCHLAND Ltd & Co KG
|
1985-03-01
|
|
|
G-012-03-85
|
|
1985-03-01
|
Engine - Fuel and Control - Fuel systems air tubes rerun P1 airline incorporating a relief valve and water drain facility with screwed blanking feature.
|
-
ROLLS-ROYCE DEUTSCHLAND Ltd & Co KG
|
1985-03-01
|
|
|
G-007-03-85
|
|
1985-03-01
|
Flight Controls - To improve the integrity of mounting of elevator torque tube.
|
|
1985-03-01
|
|
|
G-006-03-85
|
|
1985-03-01
|
Flight Controls - Inspection of complete elevator control circuit.
|
|
1985-03-01
|
|
|
G-005-03-85
|
|
1985-03-01
|
Flight Controls - To improve the integrity of mounting of elevator torque tube.
|
|
1985-03-01
|
|
|
G-004-03-85
|
|
1985-03-01
|
Flying Controls - To introduce re-designed cable guard for aileron servo cables at fuselage Stn 77.75 and fairlead at fuselage Stn 89.15.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1985-03-01
|
|
|
G-009-02-85
|
|
1985-02-01
|
DOWTY ROTOL - Landing Gear – Nose undercarriage – Introduction of new locking bolt for shock absorber pin.
|
-
APPLIANCES
-
VIKING AIR LTD
|
1985-02-01
|
|
|
G-007-02-85
|
|
1985-02-01
|
Autoflight - To inhibit Automatic Flight Control System.
|
|
1985-02-01
|
|
|
G-005-02-85
|
|
1985-02-01
|
Displacement of wing/fuselage attachment spigot bush in LH and RH wing spigot housing plate.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1985-02-01
|
|
|
F-1985-008
|
|
1985-01-30
|
Engine Fuel and Control - Fuel Injector - Replacement
|
|
1985-02-06
|
|
|
D-1984-177-2
|
|
1985-01-14
|
Cargo Hook Inadvertently Release
|
-
AIRBUS HELICOPTERS DEUTSCHLAND
|
1985-01-14
|
|
|
G-010-01-85
|
|
1985-01-01
|
Flight Manual. Amended instructions for systems operation. Ice and rain protections systems.
|
|
1985-01-01
|
|
|
G-009-01-85
|
|
1985-01-01
|
Landing gear - To embody the requirements of Menasco Service Bulletin No. 32-79 Main landing gear link assembly - replacement of life limited retainer pins.
|
|
1985-01-01
|
|
|
G-008-01-85
|
|
1985-01-01
|
CANCELLED: Flight Manual - Amended instructions for systems operation - Ice and rain protection systems.
|
|
1985-01-01
|
|
|
G-014-01-85
|
|
1985-01-01
|
CANCELLED: Flying Controls (Selector Valves) - To introduce a revised heat treated liner and bobbin assembly in selector valves part number 8661/B.
|
-
BAE SYSTEMS (OPERATIONS) LTD
-
Jetstream 3100
-
Jetstream 3200
-
Jetstream 4100
|
1985-01-01
|
|
|
G-004-01-85
|
|
1985-01-01
|
Fuselage - Rear section - To introduce reinforcing strip to L.H. and R.H. outboard seat rail lower boom between frames 33B and 34.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1985-01-01
|
|
|
D-1983-150-4
|
|
1984-12-21
|
Propellers - Root Attachment of Blades - Modification / Inspection / Overhaul
|
-
HOFFMANN PROPELLER GmbH & Co. KG
|
1984-12-21
|
|
|
D-1984-206
|
|
1984-12-07
|
Static Longitudinal Control Travel Stability
|
-
AIRBUS HELICOPTERS DEUTSCHLAND
|
1984-12-07
|
|
|
IT-1984-164
|
|
1984-12-05
|
Main Rotor - Main Rotor Blades - Inspection / Replacement
|
-
MECAER AVIATION GROUP SpA
|
1984-12-05
|
|