|
Number
|
Issued by
|
Issue date
|
Subject
|
Approval Holder / Type Designation
|
Effective date
|
Attachment |
|
G-002-03-83
|
|
1983-03-01
|
Fuselage - rear pressure bulkhead and fin attachment fitting inspection.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-03-01
|
|
|
G-001-03-83
|
|
1983-03-01
|
Flight Controls - Introduction of a once only inspection of elevator connecting rod bell crank levers.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-03-01
|
|
|
D-1983-029
|
|
1983-02-23
|
Propellers - Pitch Change Fork - Inspection
|
-
HOFFMANN PROPELLER GmbH & Co. KG
|
1983-02-23
|
|
|
US-68-04-04R2
|
|
1983-02-14
|
Tail Rotor Blade
|
|
1983-02-14
|
|
|
HB-1983-017
|
|
1983-02-09
|
Flight Controls - Aileron, Elevator and Rudder Gust Locks - Modification / Replacement
|
|
1983-02-09
|
|
|
F-1983-013-015
|
|
1983-01-26
|
Life time reduction for rotor drive element
|
|
1983-02-02
|
|
|
F-1983-012-002
|
|
1983-01-26
|
Fire extinguishing system pipes - Checking the condition and standardisation of torque loading
|
|
1983-02-02
|
|
|
G-005-07-83
|
|
1983-01-01
|
IPECO EUROPE - Flight Compartment – Pilot/Co-pilot seats and floor rail. Seat Model OA–020–0007/8. Floor Rail P/No 1A–020–0387/8.
|
-
APPLIANCES
-
ATA 25 EQUIPMENT / FURNISHINGS
|
1983-01-01
|
|
|
G-001-04-83
|
|
1983-01-01
|
IRVIN GREAT BRITAIN - Replacement of ‘two-action’ release system by a ‘single action’.
|
-
APPLIANCES
-
ATA 25 EQUIPMENT / FURNISHINGS
|
1983-01-01
|
|
|
G-012-01-83
|
|
1983-01-01
|
Doors - Introduction of improved door aperture micro switch mountings and strikers.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-01-01
|
|
|
G-009-01-83
|
|
1983-01-01
|
Doors - Introduction of a minimum standard door unsafe audible warning systems.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-01-01
|
|
|
G-008-01-83
|
|
1983-01-01
|
Communications - Port radio crate power supplies - Introduction of uprated power supply diodes for intercom and VHF communication systems
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-01-01
|
|
|
G-005-01-83
|
|
1983-01-01
|
Doors - Introduction of a minimum standard door unsafe audible warning system.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-01-01
|
|
|
G-004-01-83
|
|
1983-01-01
|
Doors - Introduction of a life and an inspection of both the crew/freight door locking mechanism swivel levers.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-01-01
|
|
|
G-003-01-83
|
|
1983-01-01
|
Flight Controls - Introduction of a stop to the cable guard assembly on the aileron tension regulator.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-01-01
|
|
|
G-002-01-83
|
|
1983-01-01
|
Flight Controls - Gust locks - Introduction of new rudder control lever, elevator lock lever and aileron lock lever.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-01-01
|
|
|
G-001-01-83
|
|
1983-01-01
|
Doors - Introduction of a periodic inspection to confirm the integrity of the door sill and secondary as detailed in Service Bulletin. lock mechanism micro switches of the crew/freight, passenger and baggage doors including large freight door where applicable
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1983-01-01
|
|
|
US-82-27-01
|
|
1982-12-30
|
Propellers - Center Relief Bore Hole, Mounting Bolt Holes and External Surfaces of Hub Area - Inspection
|
-
MCCAULEY PROPELLER SYSTEMS
|
1982-12-30
|
|
|
F-1982-191-003
|
|
1982-12-29
|
Main rotor head
|
|
1983-03-31
|
|
|
F-1982-183-032
|
|
1982-12-29
|
Main gearbox - Checking tightening of the slotted nut on the bevel gear
|
|
1983-01-05
|
|