Number
|
Issued by
|
Issue date
|
Subject
|
Approval Holder / Type Designation
|
Effective date
|
Attachment |
G-007-07-94
|
|
1994-07-01
|
Landing Gear – Introduction of an inspection of the landing gear selector lever assembly to check the security of attachment of the selector lever cam Part No. 4R4688 to the shaft Part No. 5R4688.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1994-07-01
|
|
G-008-07-94
|
|
1994-07-01
|
Engine Fuel and Control - Fuel system tubes and fittings - L.P. fuel tube from L.P. filter to H.P. pump with flexible sections
|
-
ROLLS-ROYCE DEUTSCHLAND Ltd & Co KG
|
1994-07-01
|
|
G-012-07-94
|
|
1994-07-01
|
Ice and Rain Protection - Introduction of engine de-ice timers AC69116-13 and AE20628-13.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1994-07-01
|
|
IT-1994-162
|
|
1994-06-30
|
Front fuselage structure . Inspection for corrosion .
|
|
1994-08-04
|
|
US-94-14-03
|
|
1994-06-30
|
NORDSKOG INDUSTRIES, INC. - NUPRO Pressure Relief Valve P/N SS-2C4-65 - Replacement
|
-
APPLIANCES
-
ATA 25 EQUIPMENT / FURNISHINGS
|
1994-08-01
|
|
F-1994-147-009
|
|
1994-06-28
|
A340 - Wings - Slat track canister
|
|
1994-06-28
|
|
F-1994-146-003
|
|
1994-06-28
|
A330 - Wings - Slat track canister
|
|
1994-06-28
|
|
US-94-13-06
|
|
1994-06-27
|
SUPERSEDED BY FAA AD 2013-22-06
|
|
1994-07-27
|
|
F-1994-136
|
|
1994-06-22
|
SUPERSEDED BY DGAC FRANCE AD 2001-616R1
|
|
1994-07-02
|
|
F-1994-145-039
|
|
1994-06-22
|
Free wheel
|
|
1994-06-22
|
|
US-94-12-09
|
|
1994-06-13
|
SUPERSEDED BY FAA AD 2010-21-04
|
|
1994-07-13
|
|
IT-1994-142
|
|
1994-06-08
|
Modification of wing - fuselage attachment
|
|
1994-06-14
|
|
F-1994-162-056
|
|
1994-06-06
|
Karman fairings attachment clips
|
|
1994-06-06
|
|
F-1994-161-021
|
|
1994-06-06
|
Karman fairings attachment clips
|
|
1994-06-06
|
|
G-006-06-94
|
|
1994-06-01
|
Doors - Repair to class one doors to prevent shoot-bolt bush migration.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1994-06-01
|
|
G-005-06-94
|
|
1994-06-01
|
Placards and Markings - Introduction of new cockpit limitations placard.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1994-06-01
|
|
G-004-06-94
|
|
1994-06-01
|
Doors - Main entrance door - Inspection for cracks on the handrail assembly.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1994-06-01
|
|
G-003-06-94
|
|
1994-06-01
|
Flight Control - Spoiler System- Inspection of spoiler activators and introduction of revised system flushing and bleeding procedure.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1994-06-01
|
|
ES-01-94
|
|
1994-05-26
|
Accomplish CASA Communication 235-82
|
-
AIRBUS DEFENCE & SPACE S.A.
|
1994-05-26
|
|
F-1992-084-010R2
|
|
1994-05-25
|
Fire detector
|
|
1994-05-25
|
|