|
Number
|
Issued by
|
Issue date
|
Subject
|
Approval Holder / Type Designation
|
Effective date
|
Attachment |
|
NL-1994-172-2
|
|
1996-01-31
|
WING COLLECTOR TANK AREA INSPECTION/MODIFICATION
|
|
1996-02-15
|
|
|
SE-1-087
|
|
1996-01-30
|
Equipment / Furnishing - Replacement of Thermal Insulation
|
|
1996-01-30
|
|
|
F-1994-104-160R2
|
|
1996-01-27
|
Cockpit fixed side windows
|
-
AIRBUS S.A.S.
-
A300
-
A300-600
-
A300-600ST (Beluga)
-
A310
|
1996-01-27
|
|
|
SE-1-085-R1
|
|
1996-01-22
|
Landing Gear - Anti-Skid System - Improved Hubcap Drive Coupling
|
|
1996-01-22
|
|
|
F-1996-019-028
|
|
1996-01-17
|
Elevators uncoupling mechanism
|
|
1996-01-17
|
|
|
F-1989-181R3
|
|
1996-01-17
|
Engine - No.3 Bearings - Inspection / Replacement
|
|
1996-01-27
|
|
|
F-1994-168R1
|
|
1996-01-13
|
Smoke detection in lavatories
|
|
1996-01-13
|
|
|
F-1996-011
|
|
1996-01-13
|
Improvement of avionic protection from trickling water hatch doorsealing
|
|
1996-01-13
|
|
|
F-1996-007
|
|
1996-01-13
|
Smoke detection in lavatoriesModification of the air extraction duct grilles
|
|
1996-01-13
|
|
|
F-1995-145R1
|
|
1996-01-13
|
WESTLAND-SITEC P/N E03000 - Hydraulic fire shut-off valve
|
|
1996-01-13
|
|
|
D-1996-002
|
|
1996-01-08
|
Propellers - Exchange of auxiliary feather relay
|
|
1996-01-08
|
|
|
SE-1-084
|
|
1996-01-03
|
ICE AND RAIN PROTECTION - AIRFOIL DE-ICING SYSTEM - DRAIN HOLE STABILIZER
|
|
1996-01-03
|
|
|
G-004-01-96
|
|
1996-01-01
|
Electrical Power – 70 Amp DC generation system – Replace type 10B1 or 10D1 diodes.
|
-
BRITTEN-NORMAN AEROSPACE LTD
-
BN2A (Islander)
-
BN2B (Islander)
|
1996-01-01
|
|
|
G-009-01-96
|
|
1996-01-01
|
Fuselage - To inspect wing attachment bushes in fuselage front and rear spar frames for migration and replace if required.
|
|
1996-01-01
|
|
|
G-003-01-96
|
|
1996-01-01
|
Air Conditioning - Environment control system - Inspection of the ram air inlet ducts.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1996-01-01
|
|
|
G-008-01-96
|
|
1996-01-01
|
CANCELLED: Flight Control - Aileron - Incorrect eye end bearings installed on the final drive control rod assemblies (left and right).
|
-
BAE SYSTEMS (OPERATIONS) LTD
-
Jetstream 3100
-
Jetstream 3200
-
Jetstream 4100
|
1996-01-01
|
|
|
G-007-01-96
|
|
1996-01-01
|
Electrical Power - DC generation - Overheat failure of earth posts (left and right).
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1996-01-01
|
|
|
G-006-01-96
|
|
1996-01-01
|
Fuselage - Floors - Installation of an incorrect intercostal in the floor structure of the flight compartment.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1996-01-01
|
|
|
G-005-01-96
|
|
1996-01-01
|
Placards - Main baggage bay - Introduction of new weight limitations.
|
-
BAE SYSTEMS (OPERATIONS) LTD
|
1996-01-01
|
|
|
US-95-26-13
|
|
1995-12-29
|
SUPERSEDED BY FAA AD 2017-14-04
|
-
PIPER AIRCRAFT INC.
-
PA-28 (Archer)
-
PA-28 (Cadet)
-
PA-28 (Cherokee)
-
PA-28 (Dakota)
-
PA-28 (Warrior)
-
PA-28R (Arrow)
-
PA-32 (Cherokee Six)
-
PA-32 (Saratoga)
-
PA-32R (Lance)
|
1996-02-05
|
|